The NCS Solar Project (Project) is a proposed utility-scale 250 MWac solar and 120 MW battery storage project in Butte County, CA that will go through a state-level siting approval process. This website sets forth questions that local community members may have about the Project and the developer’s response to those questions. If you have additional questions about the Project, please contact us at info@cenergypower.com.
Studies prepared for the Project will be made available on the California Energy Commission (CEC) docket. Once the docket is released on the CEC website, we will post the link here.
The developer of the Project is Cenergy Power, a national clean energy developer based in Orange County and Modesto, California. Cenergy’s mission is to develop and build clean energy projects that generate significant benefits for local communities. In its 18-year history, Cenergy has successfully built +500 clean energy projects in 12 different states. With respect to the Project, Cenergy has been screened and deemed credit worthy by the WAPA interconnection authority to connect on their transmission line.

The Project is sited on up to 1,200 of the 1,700 acres of private grazing land (Property) owned by Cenergy Power along Skyway, east of State Route 99 and west of the Town of Paradise, in unincorporated Butte County.
| Street address | 2000 Skyway, Chico, CA 95928 |
| Coordinates | 39.704350, -121.739723 |
| County district | District 5 |
The Project is in its current location because the host Property is one of only a few physically and economically viable sites for the Project. The Project requires up to 1,200 acres of contiguous space to reach appropriate scale. Existing parking lots, rooftops and other urban settings are not physically large enough to host the Project.
The Project also needs to interconnect directly to an open 230 kV WAPA line that crosses the western side of the Property. Cenergy had looked into several other potential properties in Butte County and Tehama County along this WAPA line, but we were unsuccessful in finding another suitable site.
In terms of County land use constraints, the Property is in compliance with the Butte County utility-scale solar suitability standard pursuant to the County’s Solar Overlay Guide. Up to 95% of the Project area is classified as moderate or better based on the county solar suitability overlay.
The Project is pursuing state-level certification from the California Energy Commission (CEC) pursuant to Assembly Bill 205 (AB 205), codified in California Public Resources Code Section 25545.1. AB 205 provides a consolidated environmental review process for utility-scale clean energy infrastructure and was intended to accelerate the deployment of clean energy infrastructure required to meet California's statutory climate and grid reliability mandates.
AB 205 requires projects to deliver an overall net positive economic benefit to the host jurisdiction (§ 25545.9) and execute one or more legally binding Community Benefits Agreements (CBAs). Cenergy’s intent is also for the Project to comply with Butte utility-scale solar suitability standards in all material respects.
The primary benefit of the Project is its production of clean and cost-effective energy in Butte County, which will support California’s grid reliability and climate mandates. By working with local power authorities, Cenergy aims to prioritize local power offtake, supplying affordable, clean electricity to local homes and businesses while mitigating exposure to rising utility generation rates.
On the CBA front, Cenergy Power has discussed with, and submitted, a formal bilateral CBA proposal to the County Board of Supervisors. Key commitments include:
The Project is also in discussions with leading local organizations on additional CBA commitments of up to $2,000,000. Such organizations include CSU Chico and the Alliance for Resilience and Community Health (ARCH).
The site is characterized by a geology of hard volcanic rock, which limits both the commercial developability and environmental habitability of the site. Independent biologists surveyed the site for all material and relevant biological resources and noted that the blue oak trees are the primary environmental concern.
Preserving the blue oak trees was the primary objective of our site redesign following community feedback in September 2026. Our current design reflects the following blue oak mitigation.
| Blue oaks on the Property | about 7,047 |
| Healthy blue oaks on the Property | about 5,370 |
| Healthy blue oaks kept | about 3,800 (over 70%) |
| Blue oaks kept in every condition class | about 5,052 (about 72%) |
Discussions with the Butte County Resource Conservation District are also under way that focus on stewardship of the healthy blue oaks and the overall nature areas. Once the Project’s application is filed with the CEC, the California Department of Fish and Wildlife and other wildlife agencies may comment and require further mitigation on the potential biological impacts of the Project, including oak tree removal.



Hydrogeologic assessments by groundwater experts backed by an onsite test well drilled in August 2026, indicate that the effect of project pumping on groundwater levels would not be material.
Key hydrogeologic and water management specifications include:
These dates are the Project’s current schedule and are subject to change.
| File the AB 205 application with CEC | October 2026 |
| CEC approval | February 2028 |
| Construction commencement | April 2028 |
| Construction completion | Year-end 2029 |
Yes, the current site plan is here. We updated our design to open the nature area highlighted in light green to about 574 acres. The Project has two access points along the south side of Skyway. The first is across from Spanish Garden Drive, at the northwest section of the project. The second entrance is across Oak Ridge Drive. The two entrances include deceleration and acceleration lanes designed for Skyway speeds.
Gravel access roads have been designed in consultation with Cal Fire and the Butte County Fire Department for direct and convenient access.


Public safety is central to the facility's design. The Project integrates advanced fire prevention engineering and connects clean power directly into the regional transmission system.
Safety features and integration specifications include:
If we use a different battery storage specification by the time we commence construction, it will similarly comply with all applicable fire safety standards.

Three photograph street view points are set forth below, numbered in driving order from Chico: the first looking southeast toward the substation and battery area, the second along Skyway directly in front of the project, and the third from the stop line at the end of Rocky Bluff Drive. The first photograph shows the Property's existing condition and the second shows the Project on an as-built basis.
These street view drawings are preliminary. Official visual simulations will be submitted as part of the Project’s application to the CEC.

In addition to the Project's state-level compliance pursuant to AB 205, the Project complies with Butte County’s zoning ordinance and Butte County Utility-Scale Solar Guide in all material respects. For each material requirement, the table below sets forth the requirement and how the Project complies:
| Requirement | Summary of requirement | Project Compliance |
|---|---|---|
| Permitted location for utility-scale solar in the county | A utility-scale project is allowed in certain agriculture zones that are not under a Williamson Act contract. | The Property is zoned agriculture (AG-40) and Multizone. The Project site is on grazing land that is not under a Williamson Act contract. |
| Electrical and safety standards | A utility-scale project must meet all applicable electrical and safety codes. | The Project will comply with all applicable electrical and safety codes. |
| Setbacks from scenic highway | Setbacks for a utility-scale project shall be at least 350 feet from scenic highways. | The Project equipment is setback at least 350 feet. |
| Removal when the Project ends | A facility idle for 24 months is considered abandoned; all equipment must be removed. | The Project’s decommissioning plan provides for removing all equipment. |
| Operating noise | In non-urban areas, 50 dBA in the daytime, 45 dBA in the evening and 40 dBA at night; urban limits are 5 dBA higher. | The Project noise study shows 34 to 47 dBA in daytime and 15 to 31 dBA in evening and at night from the six nearest homes. |
|---|---|---|
| Water supply | Major projects show an adequate water supply, including an evaluation of potential cumulative impacts to surrounding groundwater users and the environment. | The Project's water supply assessment, a hydrogeologist’s groundwater study, and an onsite test well all show an adequate supply. Please refer to Question Six above. |
| Fire protection plan | Projects in High or Very High fire hazard zones shall prepare a fire protection plan. | The Project has a fire protection plan in consultation with Butte County Fire Department. |
| Migratory deer | Consider design measures such as wildlife movement corridors. | The Project layout keeps a deer corridor outside the Project fence. |
|---|---|---|
| Cultural resources | Avoid or mitigate impacts to significant cultural resources. | The Project avoids significant cultural resource. |
| Biological study | Provide a biological resource study by a qualified biologist that maps sensitive species. | The Project completed biological resource studies using qualified experts. |
| Erosion, stormwater and dust control plans | Provide a stormwater pollution prevention plan, an erosion control plan, and a dust control plan. | The Project will have such plans as part of the CEC application. |
Your comments go to the NCS Solar project team at Cenergy Power.